Consortium ambitions
By the end of this project, the RELIANCE Partners will have
set several ambitions for a European Power Transmission Network, which
will structure the RELIANCE RTD coordination action. These ambitions are:
- optimize reliability to support electricity as a vital, cost-efficient
energy system
- increase integration of electricity market
- support for massive penetration of RES and DER
- improve transmission system robustness (survivability and resilience)
- the sustainable grid development
These ambitions are periodically reviewed and refined during the course
of the project.
The Consortium Parties aim to meet the following five objectives
over the Commission Contract duration:
- to define the knowledge that lacks to support a collective
vision of the performance upgrades required by the European Transmission
Network in 2030;
- to delineate the candidate roadmaps which will support the
underlying RTD work load required to meet the above needs;
- to define, within these RTD roadmaps, the share of RTD work
which will need joint and coordinated work at a European level and at the
various national levels;
- to propose an autonomous and permanent RTD structure together
with its funding scenario to support the coordinated part of the work at
a European level, in coherence with what will remain funded at national
level;
- to reach a collective conviction about RTD performance and
coordination of a majority of key players (TSO, research organizations,
regulators and clients of the TSO’s) to support the enhancement of
an optimized European power transmission network.
|